Amendment to HCP RE: Marbled Murrelet Interim Strategy
Click Here for Survey
Home > Science & Environment > Topics > Current SEPA DNR Non-Project Actions > Amendment to HCP RE: Marbled Murrelet Interim Strategy
Amendment to HCP RE: Marbled Murrelet Interim Strategy 
 
Current SEPA Actions for


Amendment to HCP RE: Marbled Murrelet Interim Strategy

The above Department of Natural Resources proposal is linked to several SEPA documents about that proposal for your review:

Final Documents as one file (2674KB  PDF)

Final Documents in pieces:

SEPA Comment Period Extension (19KB  PDF)

Complete SEPA packet (14970KB  PDF)

SEPA packet in pieces:

Comments should be submitted to the SEPA Center at sepacenter@dnr.wa.gov or PO Box 47015, Olympia, Washington 98504-7015 for distribution to the responsible official.

For PDF files download Adobe Acrobat.

 ‭(Hidden)‬ Files Filter

to specify items for consumption by a Data View. To change the list that this refers to, check the Miscellaneous group in the sidebar tool for the ListURL value and change the URL to point to a different list.

 ‭(Hidden)‬ Contacts Filter

to specify items for consumption by a Data View. To change the list that this refers to, check the Miscellaneous group in the sidebar tool for the ListURL value and change the URL to point to a different list.

 Contacts

For Information About DNR's SEPA Center
Washington State Department of Natural Resources
360-902-1739
sepacenter@dnr.wa.gov

 Files

system_empty.txt  EMPTY FILE  (0KB  TXT)

 Related Links